Plumbing Works On-Site Projects
Click on the photos to view them as enlarged version.
New ETA disposal site at Mt.Burrell
New ETA disposal site at Mt.Burrell
Test hole drilling for Soil Analysis
Test hole drilling for Soil Analysis
Three 20m ETA Beds being constructed at Stoney Chute in Nimbin
Three 20m ETA Beds being constructed at Stoney Chute in Nimbin
Two 10m x 2m ETA Beds for Gray Water System at the Rainbow Power Company in Nimbin
Two 10m x 2m ETA Beds for Gray Water System at the Rainbow Power Company in Nimbin
Reed Beds at Tuntable Falls Road Nimbin
Reed Beds at Tuntable Falls Road Nimbin
Outlet arrangement to accommodate swivel pipe at Stokers Siding
Outlet arrangement to accommodate swivel pipe at Stokers Siding
ETA Bed being prepared with clay braking gypsum
ETA Bed being prepared with clay braking gypsum
Reed Bed under construction at Jarlanbah Eco-community Nimbin
Reed Bed under construction at Jarlanbah Eco-community Nimbin
2-way out of a 3-way Diversion Box
2-way out of a 3-way Diversion Box
Drainage system for a house site Crofton Road Nimbin
Drainage system for a house site Crofton Road Nimbin
Just completed 3 x 15m long ETA Beds at Jarlanbah Nimbin
Just completed 3 x 15m long ETA Beds at Jarlanbah Nimbin
A Syphon Dosing Device for a Gray Water System at Gungas Road Nimbin
A Syphon Dosing Device for a Gray Water System at Gungas Road Nimbin
Two 16m ETA Beds for a small primary system at Gungas Road Nimbin
Two 16m ETA Beds for a small primary system at Gungas Road Nimbin
Three 15m ETA Beds for a primary system at Mt Burrell
Three 15m ETA Beds for a primary system at Mt Burrell
Over-grown ETA Beds at a site in Nimbin
Over-grown ETA Beds at a site in Nimbin
Future ETA Bed site at Chowan Creek
Future ETA Bed site at Chowan Creek
ETA Beds at Jarlanbah supplied by a pump operated Biolytix, and dosed by the Indexing Valve in the front
ETA Beds at Jarlanbah supplied by a pump operated Biolytix, and dosed by the Indexing Valve in the front
2500L Gray Water Tank supplies 2 x 10m ETA Beds at Jiggi
2500L Gray Water Tank supplies 2 x 10m ETA Beds at Jiggi
Gray Water ETA Beds at Shipway Road Nimbin
Gray Water ETA Beds at Shipway Road Nimbin
Layout and test drilling for Soil Analysis at a site near Casino
Layout and test drilling for Soil Analysis at a site near Casino
ETA Beds under construction at Tyalgum
ETA Beds under construction at Tyalgum
Test drilling for a sub-division at Gungas Road Nimbin
Test drilling for a sub-division at Gungas Road Nimbin
Diversion Box and tank installed at Mt Burrell
Diversion Box and tank installed at Mt Burrell
3000L septic tank and 3-way Diversion Box installed at a site at Tyalgum
3000L septic tank and 3-way Diversion Box installed at a site at Tyalgum
Tank and lines installed for a graywater system at Nimbin
Tank and lines installed for a graywater system at Nimbin
Pipeline for centralised sewage system at Mebbin Springs
Pipeline for centralised sewage system at Mebbin Springs
Inspection shaft and house connection (connected to Biolytix)
Inspection shaft and house connection (connected to Biolytix)
On-Site Wastewater Management Systems
On-Site Wastewater Management Systems
Elbow Pipe
Horizontal T Pipe
Blue Tap
Red Tap
Vertical T Pipe