Plumbing Works On-Site Projects |
Click on the photos to view them as enlarged version. |
|
New ETA disposal site at Mt.Burrell |
|
|
Test hole drilling for Soil Analysis |
|
|
Three 20m ETA Beds being constructed at Stoney Chute in Nimbin |
|
|
Two 10m x 2m ETA Beds for Gray Water System at the Rainbow Power Company in Nimbin |
|
|
Reed Beds at Tuntable Falls Road Nimbin |
|
|
Outlet arrangement to accommodate swivel pipe at Stokers Siding |
|
|
ETA Bed being prepared with clay braking gypsum |
|
|
Reed Bed under construction at Jarlanbah Eco-community Nimbin |
|
|
2-way out of a 3-way Diversion Box |
|
|
Drainage system for a house site Crofton Road Nimbin |
|
|
Just completed 3 x 15m long ETA Beds at Jarlanbah Nimbin |
|
|
A Syphon Dosing Device for a Gray Water System at Gungas Road Nimbin |
|
|
Two 16m ETA Beds for a small primary system at Gungas Road Nimbin |
|
|
Three 15m ETA Beds for a primary system at Mt Burrell |
|
|
Over-grown ETA Beds at a site in Nimbin |
|
|
Future ETA Bed site at Chowan Creek |
|
|
ETA Beds at Jarlanbah supplied by a pump operated Biolytix, and dosed by the Indexing Valve in the front |
|
|
2500L Gray Water Tank supplies 2 x 10m ETA Beds at Jiggi |
|
|
Gray Water ETA Beds at Shipway Road Nimbin |
|
|
Layout and test drilling for Soil Analysis at a site near Casino |
|
|
ETA Beds under construction at Tyalgum |
|
|
Test drilling for a sub-division at Gungas Road Nimbin |
|
|
Diversion Box and tank installed at Mt Burrell |
|
|
3000L septic tank and 3-way Diversion Box installed at a site at Tyalgum |
|
|
Tank and lines installed for a graywater system at Nimbin |
|
|
Pipeline for centralised sewage system at Mebbin Springs |
|
|
Inspection shaft and house connection (connected to Biolytix) |
|